The critical path method (CPM) identifies:
Correct Answer
Option A is the correct answer.
Detailed Explanation
CPM pinpoints the longest sequence of dependent activities that dictates total project length[cite: 2].
Hint
Which sequence determines the minimum possible project timeframe?